©2022 East Japan Railway Company

TAKANAWA GATEWAY CITY

  • Location: Tokyo
  • Scheduled completion: March 2025 to March 2026
  • Design: (Joint Venture) JRED, JR East Consultants Company,
    Nihon Sekkei, inc., Nikken Sekkei Ltd.
  • Complex Building I Exterior Design Architect and Entrance Interior Design:
    Pickard Chilton
  • Complex Building I Hotel Interior Design: Yabu Pushelberg
  • Cultural Creation Building Exterior Design: Kengo Kuma and Associates
  • Residence Building Residential Space Interior Design:
    HBA/Hirsch Bedner Associates
  • Lighting Design: SIRIUS LIGHTING OFFICE
  • *Perspective drawing shown is a sample image and the design might change in future.

Entire area: model (overall view from Takanawa Gateway Station)
Plaza in front of the station: model (plaza in front of the station as viewed from top of Takanawa Gateway Station)
Block 4: Complex Building I (From Southeast)
©2022 East Japan Railway Company
Block 4: Complex Building I (Entrance)
©2022 East Japan Railway Company
Block 3: Complex Building II (From Northeast)
©2022 East Japan Railway Company
Block 3: Complex Building II (2F Deck)
©2022 East Japan Railway Company
Block 2: Cultural Creation Building (From Northeast)
©2022 East Japan Railway Company
Block 2: Cultural Creation Building (Foyer)
©2022 East Japan Railway Company
Block 1: Residence Building (From Southeast)
©2022 East Japan Railway Company
Station Plaza
©2022 East Japan Railway Company
Biotope Space
©2022 East Japan Railway Company

| Special site | TAKANAWA GATEWAY CITY urban development